Off-grid capable units compliant with IECC + Title 24. Delivered as 20-ft containers that expand on-site. No subcontractors needed—completed in a week with proven resilience and factory QA.

Deployment Type

Emergency Housing Community

48

Units

30d

Full Build

FHA

Certified

Proven at Scale

Deployed nationwide for emergency response, disaster relief, workforce housing, and transitional shelter programs.

Complete Drawings

Pre-engineered with full construction documentation ready to submit

Complete Drawings

Pre-engineered with full construction documentation ready to submit

Complete Drawings

Pre-engineered with full construction documentation ready to submit

Code Compliant

Meets international codes including strict South Florida standards

Code Compliant

Meets international codes including strict South Florida standards

Code Compliant

Meets international codes including strict South Florida standards

Nationwide Ready

Engineered for deployment across all US building jurisdictions

Nationwide Ready

Engineered for deployment across all US building jurisdictions

Nationwide Ready

Engineered for deployment across all US building jurisdictions

10-Day Deployment Timeline

From contract execution to occupancy-ready units. Streamlined process designed for rapid municipal response. Phase 1

Phase 1

RFP & Site Assessment

Days 1-3

Phase 1Review requirements, conduct site evaluation, finalize specifications and unit count.

RFP review & clarification

Site inspection & survey

Utility verification

Finalize unit configuration

Phase 1

RFP & Site Assessment

Days 1-3

Phase 1Review requirements, conduct site evaluation, finalize specifications and unit count.

RFP review & clarification

Site inspection & survey

Utility verification

Finalize unit configuration

Phase 1

RFP & Site Assessment

Days 1-3

Phase 1Review requirements, conduct site evaluation, finalize specifications and unit count.

RFP review & clarification

Site inspection & survey

Utility verification

Finalize unit configuration

Phase 2

Manufacturing & Logistics

Days 4-7

Factory production of modular units, quality control, and transportation coordination.

Production initiation

Quality inspections

Transportation scheduling

Site preparation coordination

Phase 2

Manufacturing & Logistics

Days 4-7

Factory production of modular units, quality control, and transportation coordination.

Production initiation

Quality inspections

Transportation scheduling

Site preparation coordination

Phase 2

Manufacturing & Logistics

Days 4-7

Factory production of modular units, quality control, and transportation coordination.

Production initiation

Quality inspections

Transportation scheduling

Site preparation coordination

Phase 3

Installation & Commissioning

Days 8-10

On-site installation, utility hookup, final inspections, and unit activation.

Unit delivery & placement

Utility connections

Final inspections

Occupancy clearance

Phase 3

Installation & Commissioning

Days 8-10

On-site installation, utility hookup, final inspections, and unit activation.

Unit delivery & placement

Utility connections

Final inspections

Occupancy clearance

Phase 3

Installation & Commissioning

Days 8-10

On-site installation, utility hookup, final inspections, and unit activation.

Unit delivery & placement

Utility connections

Final inspections

Occupancy clearance

Certified & Code-Compliant

Every Mesocore unit meets or exceeds federal, state, and local building standards. Pre-certified to streamline procurement and deployment.

IECC Compliant

Meets International Energy Conservation Code requirements for thermal performance, air sealing, and mechanical system efficiency.

IECC Compliant

Meets International Energy Conservation Code requirements for thermal performance, air sealing, and mechanical system efficiency.

IECC Compliant

Meets International Energy Conservation Code requirements for thermal performance, air sealing, and mechanical system efficiency.

California Title 24

Fully certified to California's stringent energy efficiency standards for residential construction and energy systems.

California Title 24

Fully certified to California's stringent energy efficiency standards for residential construction and energy systems.

California Title 24

Fully certified to California's stringent energy efficiency standards for residential construction and energy systems.

IBC/IRC Structural

Engineered to International Building Code and International Residential Code specifications for wind, seismic, and snow loads.

IBC/IRC Structural

Engineered to International Building Code and International Residential Code specifications for wind, seismic, and snow loads.

IBC/IRC Structural

Engineered to International Building Code and International Residential Code specifications for wind, seismic, and snow loads.

HUD Code Certified

Federal manufactured housing standards compliance for structural integrity, fire safety, and plumbing/electrical systems.

HUD Code Certified

Federal manufactured housing standards compliance for structural integrity, fire safety, and plumbing/electrical systems.

HUD Code Certified

Federal manufactured housing standards compliance for structural integrity, fire safety, and plumbing/electrical systems.

Pre-Stamped Engineering

Licensed professional engineer drawings and calculations ready for immediate permit submittal. No redesign required.

Pre-Stamped Engineering

Licensed professional engineer drawings and calculations ready for immediate permit submittal. No redesign required.

Pre-Stamped Engineering

Licensed professional engineer drawings and calculations ready for immediate permit submittal. No redesign required.

Factory QA Certification

ISO 9001 quality management with documented testing protocols for all structural, mechanical, and electrical systems.

Factory QA Certification

ISO 9001 quality management with documented testing protocols for all structural, mechanical, and electrical systems.

Factory QA Certification

ISO 9001 quality management with documented testing protocols for all structural, mechanical, and electrical systems.

Request Proposal / RFP Package

Download complete RFP documentation including IECC + Title 24 certifications, stamped engineering drawings, and deployment specifications.

Container-Based Rapid Deployment

Delivered as standard 20-ft containers, expanding on-site to full living quarters. Off-grid capable with factory QA. No subcontractors, no weather delays—completed in one week.

20-ft container

Expands on-site

600-1200 sq ft

Multiple configurations

7 days

No subcontractors

150+ mph

Hurricane certified

Off-Grid capable

Solar + battery ready

IECC Title 24

Pre-certified

Proven Resilience + Factory QA

Every unit undergoes comprehensive factory testing before shipment. Steel-frame construction with hurricane-grade wind ratings ensures long-term durability in the harshest deployment environments.