ADU Cost, Financing & ROI in Broward County, Florida
Insights
November 3, 2025
minute read

Key Takeaways
Broward County ADU construction costs range from $120,000 to $250,000 for turnkey 400-600 square foot units, with prefab modular options like Mesocore's Model E ADU offering faster installation and predictable pricing compared to traditional site-built construction
Rental income potential reaches $1,800-$2,500 monthly for small ADUs in South Florida's high-demand rental market, generating 10-12% annual ROI with payback periods of 5-7 years for cost-effective builds
ADU rules vary by municipality across Broward County, with many jurisdictions now permitting ADUs in residential zones
Hurricane-rated construction is mandatory in Broward's High Velocity Hurricane Zone, requiring design to applicable ASCE 7 wind speeds and approved impact protection that add initial costs but provide insurance savings and structural resilience
Multiple financing pathways exist including construction loans, home equity products, and specialized ADU financing through Ocean Capital Lending, plus personal loan options from HFS Financial offering up to $300,000 with no equity requirements
Factory-installed MEP systems eliminate rough-in inspections in some jurisdictions, with Mesocore's Intertek-certified plumbing, electrical, and mechanical systems pre-installed before delivery to accelerate construction timelines
Off-grid solar capability cuts utility costs with 6 kW solar arrays and dual 10 kWh lithium-ion batteries qualifying for the 30% federal Residential Clean Energy Credit (subject to IRS rules), though off-grid operation depends on local codes as many Broward municipalities require utility connections where available
What Is an Accessory Dwelling Unit (ADU) in Broward County?
Accessory Dwelling Units are secondary, self-contained residential units located on the same property parcel as a primary single-family home. These independent living quarters include their own kitchen facilities, bathroom, sleeping area, and separate entrance.
ADUs in Broward County can take several forms:
Detached structures: Standalone buildings separate from the main house
Attached additions: Connected to the primary residence with independent access
Garage conversions: Existing garages transformed into living space
Interior conversions: Basement or attic spaces converted to self-sufficient units
All ADUs in Broward County must comply with Florida Building Code requirements, including High Velocity Hurricane Zone (HVHZ) standards that require design to applicable ASCE 7 wind speeds and approved impact protection (such as impact-rated glazing or approved shutters).
Detached vs. Attached ADUs
Detached ADUs offer maximum privacy and flexibility but typically cost more due to separate foundation, utility connections, and complete building envelope requirements. These structures range from 400-1,000 square feet and work well as backyard cottages for rental income or family housing.
Attached ADUs reduce construction costs by sharing walls, utilities, and roof structures with the primary residence. However, they may require more extensive permitting review and offer less privacy for occupants.
Broward County Zoning Requirements
Many Broward municipalities now allow some form of ADU or accessory living unit in single-family zones, but rules are hyper-local. Common requirements include:
Minimum lot sizes of 5,000-7,500 square feet
Maximum ADU size limits of 400-1,200 square feet
Setback requirements matching primary structure standards
Owner-occupancy provisions in some jurisdictions
Parking space allocations (typically 0-1 additional spaces required)
Mesocore's site plan service confirms zoning feasibility, setback compliance, and utility requirements for your specific Broward County parcel for a $200 refundable deposit, helping homeowners avoid costly permitting mistakes before beginning construction.
Average ADU Cost in Broward County: What to Expect
Building an ADU in Broward County requires budgeting for both construction costs and site-specific expenses unique to Florida's hurricane-prone coastal environment. Total costs range from $120,000 to $250,000 for completed 400-600 square foot units.
Cost Breakdown by ADU Size (300-600 sq ft)
Per-square-foot pricing in Broward County averages:
Budget builds: $250-$300 per square foot for basic garage conversions or modular installations
Mid-range construction: $350-$450 per square foot for standard detached ADUs with quality finishes
High-end builds: $500-$600 per square foot for custom designs with premium materials
A typical 410 square foot ADU like Mesocore's Model E starts at $129,000 factory MSRP with hurricane-rated steel core construction, 6-KW solar system, and complete kitchen and bathroom packages. This includes robotically welded structural framing, impact windows and doors, and all MEP systems factory-installed and Intertek-certified.
What Drives Cost Variation in Broward County?
Site preparation expenses vary dramatically based on property conditions:
Foundation costs: Concrete pier foundations for the Model E require 8 piers, while slab foundations for larger units run $6-$14 per square foot
Soil testing and grading: $2,000-$5,000 for standard sites; $5,000-$15,000 for complex terrain
Utility connection fees: $3,000-$10,000 for standard hookups to municipal systems
HVHZ-rated construction: Hurricane code compliance adds 15-25% to material costs
Permit and impact fees: Variable by municipality, typically $1,500-$8,000
Mesocore's off-grid solar capability qualifies for the 30% federal Residential Clean Energy Credit (subject to IRS rules), though off-grid operation depends on local codes as many Broward municipalities require utility connections where available. The integrated 6 kW solar array with dual 10 kW lithium-ion batteries (factory-integrated storage system) provides complete energy independence when permitted.
Labor costs represent another major variable. Traditional site-built construction requires coordinating multiple subcontractors over 6-12 months, while modular systems with factory-installed MEP components reduce on-site work. Mesocore's Model E can be installed in as little as 10 days after foundation preparation, minimizing labor expenses and construction loan carrying costs.
Prefab ADU Cost vs. Site-Built: Which Is Right for You?
Factory-built prefab ADUs offer distinct cost and timeline advantages over traditional stick-built construction, particularly in Broward's high-velocity hurricane zone where specialized labor and materials command premium pricing.
How Prefab ADUs Lower Labor Costs
Traditional site-built ADUs require coordinating electricians, plumbers, HVAC technicians, framers, roofers, and finish carpenters across multiple months. Each trade visit incurs separate labor charges, mobilization fees, and scheduling delays that extend project timelines.
Prefab modular construction consolidates this work in factory conditions where:
All plumbing, electrical, and mechanical systems install in controlled environments
Factory inspections by third-party agencies like Intertek certify systems before shipping
Rough-in inspections eliminate on-site in some jurisdictions, reducing total inspection requirements
Weather delays don't affect construction schedules
Material waste drops through precision manufacturing
Mesocore's hybrid construction system ships as a 20-foot ISO-certified container with a robotically welded steel core and all prefabricated components—a complete "house in a box" that expands on-site. The swing-up roof system, prefabricated wall panels with LP® Smart Side® cedar siding, and factory-installed appliances arrive ready for final assembly.
Delivery and Installation in Broward County
Prefab ADU delivery costs vary by distance from manufacturing facilities. The Model E ships via truck, rail, or ocean cargo in its 20-foot container format. Delivery to Broward County from Mesocore's Palm Beach-area factory typically costs $3,000-$5,000 including crane placement onto prepared foundations.
On-site installation timeline comparison:
Prefab Modular (10-30 days):
Foundation installation: 3-7 days
Core delivery and placement: 1 day
Wall panel assembly: 2-4 days
Roof deployment and sealing: 1-2 days
Utility connections: 2-3 days
Interior finishes and painting: 3-7 days
Final inspections: 1-3 days
Traditional Site-Built (6-12 months):
Foundation: 2-4 weeks
Framing: 3-6 weeks
Rough-in (electrical, plumbing, HVAC): 4-8 weeks
Inspections and corrections: 2-4 weeks
Insulation and drywall: 3-4 weeks
Interior finishes: 6-10 weeks
Final inspections: 2-4 weeks
The accelerated timeline reduces construction loan interest charges and allows faster rental income generation, improving overall project ROI.
ADU Financing Options for Broward County Homeowners
Multiple financing pathways exist for Broward County ADU construction, each suited to different equity positions, credit profiles, and project timelines. Most traditional lenders view ADU projects as home improvements rather than new construction, opening several product categories.
Home Equity Line of Credit (HELOC) for ADUs
HELOCs provide flexible financing for homeowners with substantial equity. These revolving credit lines allow drawing funds as needed during construction, paying interest only on borrowed amounts.
Current Florida HELOC rates average 7.25-9.50% APR, tied to the Wall Street Journal Prime Rate. Maximum loan-to-value ratios typically reach 80% of current home value, requiring 20% existing equity plus the ability to cover ADU costs within the credit limit.
HELOC advantages include:
Interest-only payments during construction
No draw requirements—use funds as needed
Existing mortgage rates remain unchanged
10-year draw periods with 20-year repayment terms
Requirements typically include:
Credit scores of 680+
Debt-to-income ratios below 43%
Proof of income and employment
Property appraisal
Construction Loans vs. Renovation Loans
Construction-to-permanent loans offer single-closing convenience with interest rates of 6.75-7.5% for qualified borrowers. These products convert automatically to permanent mortgages after construction completion, eliminating double closing costs.
Construction loan requirements include:
10-20% down payments
Licensed contractor agreements
Approved plans and permits
Lender inspections at draw milestones
6-12 month construction periods
FHA 203(k) rehabilitation loans now count ADU rental income in mortgage qualification calculations—75% of estimated income for existing ADUs and 50% for new construction. This 2023 policy change significantly improves borrowing power for ADU developers.
Minimum credit scores of 580 enable 3.5% down payments, while scores of 500-579 require 10% down. Mortgage insurance adds 1.75% upfront plus 0.55-0.85% annually.
Cash-Out Refinance Options
Cash-out refinancing replaces existing mortgages with new, larger loans, extracting equity as cash for ADU construction. This option makes sense for homeowners with low current interest rates from 2020-2021 who've gained substantial equity through appreciation.
Broward County property values increased 20-30% in recent years, creating refinancing opportunities. Maximum loan-to-value ratios of 80% leave 20% equity cushion while accessing construction funds.
Accessory Dwelling Unit Plans: From Design to Permit in Broward
Professional ADU plans meeting Florida Building Code requirements form the foundation of successful permitting. Broward County jurisdictions require engineered construction drawings, structural calculations, and energy compliance documentation.
What's Included in a Complete ADU Plan Set?
Comprehensive ADU plans include:
Architectural Drawings:
Site plan showing property boundaries, setbacks, and ADU placement
Foundation plan with pier or slab specifications
Floor plan with room dimensions and door swings
Exterior elevations showing all four sides
Building sections and construction details
Roof framing plan
Structural Engineering:
Stamped structural calculations by Florida-licensed engineer
Hurricane load analysis for HVHZ compliance
Foundation design for local soil conditions
Roof tie-down and connection details
Impact window and door specifications
MEP Drawings:
Electrical plan with panel, circuits, and fixture locations
Plumbing plan showing supply and drain routing
HVAC design with equipment specifications
Energy compliance calculations
Code Compliance Documentation:
Florida Building Code compliance affidavit
HVHZ product approvals for windows and doors
Energy code calculation worksheets
Accessibility provisions if required
Mesocore's Model E ADU includes approved engineered construction drawings as part of the $129,000 factory MSRP. The company manages permit submittals and provides stamped structural calculations certified for Broward County HVHZ requirements, eliminating the need to hire separate architects and engineers.
Navigating Broward County Permitting
Permit timelines in Broward County vary by municipality but typically require 4-12 weeks for ADU approvals.
Common permit requirements include:
Completed application forms with property owner signature
Full plan sets (typically 3-5 copies)
Structural calculations sealed by Florida PE
Energy compliance documentation
Impact fee payments
HOA approval letters (if applicable)
First-time submittals often receive correction requests requiring plan revisions. Working with experienced ADU builders or using pre-approved modular designs like Mesocore's reduces correction cycles and accelerates approval.
Permitting costs range from $1,500-$8,000 depending on project valuation, with additional impact fees for roads, schools, parks, and emergency services varying by municipality. Mesocore's permitting support includes managing drawings, engineering coordination, and local building department interactions to keep projects on schedule.
ADU ROI: Rental Income and Property Value Gains in Broward County
ADUs generate financial returns through two primary mechanisms: monthly rental income and increased property valuation. Broward County's strong rental market and housing shortage create favorable conditions for both.
Average ADU Rental Rates in Broward County
South Florida ADU rental rates range from $1,800-$2,500 monthly for 400-500 square foot units, representing the highest rates in Florida. Location and amenities drive pricing variations:
Premium Areas:
Fort Lauderdale Beach: $2,200-$2,500
Downtown Fort Lauderdale: $2,000-$2,400
Las Olas Isles: $2,100-$2,500
Wilton Manors: $1,900-$2,300
Mid-Range Neighborhoods:
Plantation: $1,800-$2,100
Coral Springs: $1,700-$2,000
Davie: $1,700-$2,000
Pembroke Pines: $1,700-$2,000
Value Areas:
Oakland Park: $1,600-$1,900
Pompano Beach: $1,600-$1,900
Margate: $1,500-$1,800
Broward County maintains 95.3% occupancy rates with average vacancy periods of 38 days between tenants. This strong demand supports consistent rental income with minimal vacancy losses.
Mesocore's Model E ADU offers rental advantages through included appliances, energy-efficient design, and off-grid solar capability. The 6 kW solar system with dual lithium-ion batteries reduces or eliminates tenant utility costs, making units more attractive while allowing higher rental rates or all-inclusive pricing that simplifies tenant billing.
How ADUs Boost Home Resale Value
Property values can increase up to 35% on average when ADUs are added, with typical appreciation of $225,000-$510,000 for detached units.
Factors affecting appreciation include:
Construction quality: HVHZ-rated structures with impact windows command premium valuations
Income verification: Legal permits and rental history documentation maximize appraisal value
Market conditions: Rising housing costs increase ADU values proportionally
Location: Desirable neighborhoods see higher ADU premiums
Florida's favorable tax treatment preserves these gains. The state's property tax exemption for residential solar devices excludes the added value from property tax assessments, while homestead exemptions remain intact when adding ADUs for family use.
Long-term wealth building potential reaches $600,000-$1,000,000 over 20 years through combined rental income, property appreciation, and tax savings. A $150,000 ADU investment generating $2,000 monthly rent produces:
Rental income: $480,000 over 20 years (minus operating expenses)
Property appreciation: $200,000-$300,000
Tax benefits: $50,000-$100,000 in depreciation and deduction savings
Total returns: 300-500% effective ROI
Accessory Dwelling Units for Sale: Prefab vs. Custom Options
Broward County homeowners can choose between turnkey prefab ADUs or custom-built units designed specifically for their properties. Each approach offers distinct advantages in cost, timeline, and customization potential.
Where to Find ADU Suppliers in Florida
Prefab ADU manufacturers provide complete packages with factory pricing, standardized designs, and proven installation processes. These turnkey solutions include:
Complete construction drawings and engineering
Factory-built core with MEP systems installed
All materials and components for on-site assembly
Permitting support and code compliance documentation
Warranty coverage on structural and mechanical systems
Mesocore's Model E ADU exemplifies the prefab approach with $129,000 factory MSRP covering:
410 square foot 1-bedroom, 1-bathroom layout
Robotically welded hurricane-rated steel core
6-KW solar system with 14 PV panels and dual lithium-ion batteries
Five hurricane impact windows and full-lite impact door
LP® Smart Side® cedar vertical siding with brushed smooth trim
Complete kitchen with induction cooktop, microwave/convection oven, refrigerator with ice maker, Fisher Paykel drawer dishwasher, and stainless steel sink
Full bathroom with 3'x3' shower, vanity, and fixtures
Lioher® cabinets and Wilsonart® Thinscape® countertops
Luxury vinyl plank flooring throughout
Ductless Amana heat pump/AC with HEPA air circulation
Combo washer/dryer with dedicated hookups
All electrical wiring, panel, and LED lighting factory-installed
50-gallon electric water heater
Swing-up prefabricated roof with TPO membrane
Custom-built ADUs offer unlimited design flexibility but require coordinating architects, engineers, contractors, and permitting independently.
Evaluating ADU Quality and Certifications
Quality indicators for ADU suppliers include:
Building Code Compliance:
IBC (International Building Code) approval
Florida DBPR modular home registration
HVHZ certification for Miami-Dade and Broward
Third-party inspection agency certification (Intertek, ICC-ES)
Structural Standards:
HVHZ wind rating documentation
Hurricane impact window/door test reports
Foundation engineering for local soil conditions
Tie-down and anchoring specifications
Energy Efficiency:
Energy Star appliances
High R-value insulation systems
Solar-ready or integrated solar systems
Efficient HVAC equipment with SEER ratings
Warranty Coverage:
Structural warranty (typically 10+ years)
Mechanical systems warranty (1-5 years)
Appliance manufacturer warranties
Workmanship guarantees
Mesocore's certifications include IBC approval, Florida DBPR registration, HVHZ compliance for Broward County, and Intertek certification of factory-installed MEP systems. The robotically welded steel core provides structural integrity exceeding wood-framed construction, while meeting or surpassing all Florida hurricane code requirements.
Factory tours of the Palm Beach showroom allow prospective buyers to inspect construction quality, MEP installations, and finish materials before committing to purchases.
Hurricane-Rated ADU Construction: Why It Matters in Broward County
Broward County's location in Florida's High Velocity Hurricane Zone subjects all residential construction to the state's most rigorous wind and impact standards. ADUs must meet the same requirements as primary residences to receive building permits and certificates of occupancy.
What HVHZ Certification Requires
HVHZ standards mandate design to applicable ASCE 7 wind speeds with approved impact protection for structural systems, with all components tested and approved for extreme conditions:
Structural Requirements:
Engineered tie-down systems anchoring buildings to foundations
Reinforced connections at all wall-to-roof and wall-to-foundation joints
Continuous load paths transferring forces from roof to foundation
Bracing and shear wall systems resisting lateral wind loads
Envelope Protection:
Impact-resistant windows and doors tested with 9-pound, 6-foot 2x4 lumber projectiles
Secondary water barriers beneath all roof coverings
Sealed building envelopes preventing water intrusion
Corrosion-resistant fasteners and connectors
Product Approvals:
Miami-Dade Notice of Acceptance (NOA) for all exterior products
Florida Product Approval with HVHZ endorsement
Test reports demonstrating compliance with TAS 201, 202, 203 standards
Manufacturer certifications for wind uplift resistance
Mesocore's Model E ADU achieves HVHZ compliance through robotically welded steel core construction that exceeds wood-frame strength. The factory-installed hurricane impact windows and full-lite impact door carry all required certifications, while the swing-up roof system with TPO membrane creates a sealed, wind-resistant envelope.
All MEP systems install in the factory under Intertek supervision before shipping, ensuring proper mounting and securing that might be compromised during field installation under time pressure.
Insurance Savings with Hurricane-Rated ADUs
Florida homeowners insurance costs average $11,759 annually statewide, with Broward County rates among the state's highest due to coastal exposure. Adding an ADU increases dwelling coverage requirements and proportionally raises premiums.
However, HVHZ-certified construction qualifies for mitigation discounts:
Impact-resistant windows/doors: 10-15% premium reduction
Hurricane-rated roof systems: 15-20% discount
Proper tie-downs and reinforcements: 5-10% savings
Combined fortification: up to 45% total premium reduction
Insurance companies verify HVHZ compliance through:
Building department permit documentation
Product approval certificates
Wind mitigation inspection reports
Structural engineering certifications
Properly documented hurricane-rated ADUs not only reduce insurance costs but also improve coverage availability. Many Florida insurers now limit policies in coastal areas—HVHZ-compliant structures have better access to competitive quotes.
The HVHZ wind rating also protects investment value. Permitting violations in Florida can result in fines ranging from $1,000 per day for first violations to $5,000 per day for repeat violations, with one-time fines up to $15,000 for irreparable violations, while unpermitted structures may require removal or expensive after-the-fact permitting. HVHZ-certified ADUs maintain full legal status and resale value.
Steps to Finance and Build Your ADU in Broward County
Successfully completing a Broward County ADU project requires coordinating financing, permitting, site preparation, and construction in proper sequence. Understanding the process prevents costly delays and budget overruns.
Timeline from Concept to Move-In
Phase 1: Feasibility and Pre-Planning (2-4 weeks)
Confirm property zoning and setback requirements
Obtain site plan feasibility analysis ($200 refundable)
Verify utility availability and connection points
Research HOA restrictions if applicable
Determine optimal ADU size and placement
Phase 2: Financing Pre-Qualification (1-2 weeks)
Calculate total project budget including soft costs
Review financing options (construction loan, HELOC, personal loan)
Submit loan applications with required documentation
Obtain pre-approval letters showing borrowing capacity
Lock interest rates if proceeding immediately
Phase 3: Design Selection and Permitting (4-12 weeks)
Finalize ADU design and finish selections
Order engineered construction drawings
Submit permit applications with fees
Respond to plan review comments if required
Obtain approved building permits
Phase 4: Site Preparation (2-4 weeks)
Clear and grade building site
Install foundation (piers or slab)
Rough-in utility connections to property line
Schedule delivery and crane services if needed
Prepare staging areas for materials
Phase 5: ADU Installation and Assembly (1-8 weeks)
Receive modular core or begin framing
Complete structural assembly and weatherproofing
Connect utilities and install systems
Install finishes, paint, and flooring
Complete punch list items
Phase 6: Inspections and Occupancy (1-3 weeks)
Schedule required building inspections
Complete corrections if needed
Obtain certificate of occupancy
Set up utility accounts
Move in or begin tenant screening
Mesocore's installation process compresses Phase 5 to as little as 10 days after foundation completion. The factory-built core with pre-installed MEP systems eliminates rough-in inspection delays in jurisdictions that accept Intertek factory certifications, accelerating the path to occupancy.
Working with a General Contractor in Broward
Licensed general contractors coordinate site work, foundation installation, utility connections, and final assembly. Florida requires contractors to hold state licenses or local certifications depending on project scope and value.
Essential contractor qualifications include:
Active Florida contractor license (verify at MyFloridaLicense.com)
General liability insurance ($1M+ coverage)
Workers compensation insurance
Local references on similar ADU projects
Familiarity with Broward County permitting
Contractor responsibilities typically include:
Site preparation and foundation installation
Coordinating utility connections
Assembling prefab components per manufacturer instructions
Installing finishes not completed in factory (paint, decks)
Managing inspection schedules
Obtaining certificate of occupancy
Clear scope-of-work documentation prevents disputes over responsibilities between the ADU manufacturer, contractor, and property owner. Mesocore provides detailed installation manuals and optional on-site technical support to ensure proper assembly of their modular systems.
Many Broward County areas have authorized Mesocore dealers who manage the complete build-out and permitting process, offering turnkey solutions where homeowners receive finished, occupancy-ready ADUs with single-point accountability.
Conclusion
An ADU in Broward County isn’t just extra space — it’s an income-producing asset. Strong rental demand, high average monthly rents, and limited inventory in South Florida mean a properly built ADU can often pay for itself within 5-7 years, then generate consistent cash flow while adding six figures to your property value. It’s one of the few ways a single-family homeowner can create new housing and long-term equity on the same lot.
But Broward is not a casual build market. You’re in a High Velocity Hurricane Zone, which means strict wind, impact, and permitting requirements that affect design, cost, insurance, and inspection. The fastest, lowest-friction path is to plan in the right order — confirm zoning, line up financing, submit engineered HVHZ-compliant plans, and work with a builder who knows Broward County inspectors. Prefab, hurricane-rated modular units with factory-installed MEP systems can shorten timelines and get you to rental income faster, as long as they’re fully code-compliant and documented.
Frequently Asked Questions
How much does a Broward County ADU cost, and what drives the price?
Most 400–600 sq ft turnkey ADUs run about $120,000–$250,000. Costs swing with site prep (foundation, grading, utility tie-ins), HVHZ hurricane requirements, finishes, and permit/impact fees (often $1,500–$8,000).
What zoning and permitting rules should I expect?
Rules are set city-by-city in Broward, so lot size, maximum ADU square footage, setbacks, parking, and owner-occupancy can vary. Plan on submitting engineered, HVHZ-compliant drawings and product approvals; typical permit review runs 4–12 weeks with possible corrections.
Prefab vs. site-built—what’s faster in Broward?
Prefab modular units with factory-installed MEPs can compress on-site assembly to 10–30 days after the foundation, while traditional builds often take 6–12 months. In some jurisdictions, third-party factory certifications can reduce or eliminate rough-in inspections, further speeding timelines.
What financing options are common for ADUs here?
Homeowners often use HELOCs, construction-to-perm loans, cash-out refis, or specialized ADU/personal loans. FHA 203(k) can count projected ADU rent (typically 75% for existing units, 50% for new builds) toward qualification, which can boost borrowing power.
What rental income and ROI can I realistically expect?
Small ADUs in South Florida commonly lease for $1,800–$2,500/month, supporting 10–12% annual ROI on cost-effective projects. Solar can lower utility bills and may qualify for the 30% federal Residential Clean Energy Credit (subject to IRS rules), but note that many Broward cities still require utility connections even if your ADU is technically off-grid capable.
